Milli MEP publishes focused engineering commentary for developers, designers, contractors and operators. Each article states its author, status, review date and project-specific limitations.
MM / KNOWLEDGE REGISTERCurrent technical briefs
Resolve the risk before it becomes a variation.
The publication set focuses on decisions that shape space, capacity, responsibility, life safety and operational performance.
DESIGN RESPONSIBILITY · 8 MIN READ
What a Basis of Design report should—and should not—promise
A Basis of Design is a decision record. If it only lists standards and describes systems, it does not control the design. Read technical brief ↗ INS-02INDUSTRIAL HVAC · 8 MIN READ
Separate comfort loads from process ventilation
A production hall is not an office with a higher air-change rate. Process release, source capture, contamination, fire risk and continuity govern the ventilation strategy. Read technical brief ↗ INS-03PLANT SPACE · 8 MIN READ
Reading a plant-room drawing: what coordinated means in practice
Plant space is the physical consequence of capacity, resilience, access, distribution and replacement decisions—not an allowance to be filled later. Read technical brief ↗ INS-04STANDARDS · 8 MIN READ
Reconciling CIBSE and ASHRAE guidance with Georgian regulations
International guidance can strengthen a design, but it does not displace local law or remove the need for a declared project hierarchy. Read technical brief ↗ INS-05LIFE SAFETY · 8 MIN READ
Smoke-control principles architects should resolve before fixing the ceiling zone
Smoke control depends on flow paths, reservoir geometry, replacement air and protected power; it cannot be added after the principal spaces are fixed. Read technical brief ↗ INS-06UTILITIES · 8 MIN READ
Why utility-capacity planning must happen before concept design
A concept cannot be commercially reliable until the project team knows what the site can receive, reject and accommodate. Read technical brief ↗Publication plan
Focused topic clusters, not search-volume filler.
Project enquiry
Have a technical question tied to a live project decision?
Share the context and the decision deadline. General content can frame the issue; a formal appointment is required before project-specific engineering advice is given.