Mechanical and HVAC engineering

Heating, cooling, ventilation and plant design developed from verified loads, operating profiles, energy criteria and spatial constraints.

MM / MEP–02
Project risk

Selecting mechanical systems before loads, ventilation duties, plant space, acoustics and controls are aligned can lock unnecessary capacity, cost and coordination risk into the project.

Required outcome

A performance-led HVAC strategy with verified loads, coordinated plant and distribution, maintainable access, defined controls and clear criteria for selection, review and commissioning.

Scope of service

Defined outputs, interfaces and stage responsibility.

The final scope is matched to the procurement route, available information and design responsibility. Unconfirmed inputs are held as project risks rather than hidden assumptions.

Scope

  • Heating and cooling-load assessment
  • Ventilation and indoor-air-quality strategy
  • Thermal comfort and overheating review
  • Plant selection and energy-source options
  • Ductwork, pipework and hydronic design
  • Controls, zoning and sequence-of-operation input

Project stages

  • Feasibility and utility review
  • Concept system selection
  • Detailed calculation and coordination
  • Tender documentation
  • Construction and commissioning support

Typical deliverables

  • Load calculations and ventilation schedules
  • Psychrometric analysis
  • Plant and equipment selections
  • Schematics and layouts
  • Pressure-loss calculations
  • Controls narrative and commissioning criteria

Critical interfaces

The design is controlled at the points where disciplines meet.

01

Envelope performance and glazing

02

Acoustic criteria

03

Electrical capacity

04

Drainage and condensate

05

Fire and smoke control

06

Access, lifting and replacement routes

Standards and review

Issue only what can be traced and checked.

Relevant CIBSE Guides, BS EN standards, BSRIA guidance, applicable Georgian requirements and ASHRAE criteria where the project basis adopts them.

Design temperatures, diversity, occupancy, operating hours and resilience assumptions are recorded before plant is selected. Vendor data is checked against the project duty rather than accepted as the design basis.

InputsDecisionCalculationReviewIssue

Relevant sectors

Applied where the operational brief shapes the engineering.

Appointment questions

Clarify responsibility before work starts.

Will Milli MEP select the final equipment?

We can define and review the technical selection within the agreed appointment. Procurement, vendor warranties and contractor substitutions remain separate responsibilities unless expressly included.

Can an existing HVAC design be independently checked?

Yes. The review scope can cover loads, system selection, plant duty, pressure loss, spatial coordination, controls and maintainability.

How are energy targets treated during system selection?

The adopted targets, operating profile and assessment method are recorded in the Basis of Design so that option comparisons and final selections remain traceable.

Project enquiry

Define the mechanical and hvac appointment.

Share the project location, stage, available information, required deliverables and decision date. We will identify the correct scope and the information needed to proceed.

Privacy controls