> Feasibility studies | Milli MEP

MEP–07 · Service

Feasibility studies

Early technical assessment of utilities, plant space, system options, compliance constraints and delivery risks before major commitments are made.

MM / MEP–07
Project risk

Land, concept and investment decisions are often made before utility capacity, plant allowances, statutory constraints and operational requirements have been tested.

Required outcome

A decision-ready technical view of viable options, missing evidence, principal risks, spatial consequences and the work needed for the next stage.

Scope of service

Defined outputs, interfaces and stage responsibility.

The final scope is matched to the procurement route, available information and design responsibility. Unconfirmed inputs are held as project risks rather than hidden assumptions.

Scope

  • Available information and constraint review
  • Utility demand and capacity assessment
  • Plant and distribution-space allowances
  • MEP option appraisal
  • Compliance and authority-risk review
  • Phasing, resilience and future-capacity assessment

Project stages

  • Site selection and acquisition
  • Development appraisal
  • Pre-concept briefing
  • Refurbishment option review
  • Recovery planning for constrained projects

Typical deliverables

  • Feasibility report
  • Option and risk matrix
  • Preliminary loads and demands
  • Plant and riser allowance schedule
  • Utility information request
  • Recommended next-stage brief

Critical interfaces

The design is controlled at the points where disciplines meet.

01

Planning and architecture

02

Utility providers and authorities

03

Fire strategy and access

04

Structure and retained fabric

05

Operator and process requirements

06

Commercial appraisal and programme

Standards and review

Issue only what can be traced and checked.

The study records the statutory and project criteria available at the time, identifies unresolved authority information and avoids presenting preliminary sizing as detailed design.

Feasibility conclusions are proportionate to the information available. Assumptions, exclusions, confidence level and decision dates are explicit so that early findings are not misused as construction information.

InputsDecisionCalculationReviewIssue

Relevant sectors

Applied where the operational brief shapes the engineering.

Appointment questions

Clarify responsibility before work starts.

How much information is needed for a feasibility study?

A location, building use, approximate area, occupancy or process brief, programme and available utility information are enough to define an initial scope; missing evidence is then recorded.

Does feasibility work replace detailed design?

No. It supports an early decision and defines the evidence, surveys, authority responses and calculations needed before detailed design.

Can refurbishment options be compared?

Yes, provided the retained systems, condition information, operating constraints and required outcomes are stated and access for any necessary survey is agreed.

Project enquiry

Define the feasibility studies appointment.

Share the project location, stage, available information, required deliverables and decision date. We will identify the correct scope and the information needed to proceed.