> Fire protection coordination | Milli MEP

MEP–04 · Service

Fire protection coordination

Defined design and coordination support for firefighting systems, smoke control and building-services life-safety interfaces.

MM / MEP–04
Project risk

Life-safety systems can fail at their interfaces when the fire strategy is incomplete, responsibilities are unclear, compartmentation changes late or cause-and-effect logic is not coordinated across disciplines.

Required outcome

A project-specific fire-protection scope with a defined regulatory basis, clear design responsibility, coordinated interfaces, stated performance criteria and traceable evidence for review, testing and acceptance.

Scope of service

Defined outputs, interfaces and stage responsibility.

The final scope is matched to the procurement route, available information and design responsibility. Unconfirmed inputs are held as project risks rather than hidden assumptions.

Scope

  • Fire-strategy and MEP interface review
  • Smoke-control and pressurisation coordination
  • Firefighting-water and suppression coordination
  • Fire-alarm and cause-and-effect interface review
  • Compartmentation and fire-damper coordination
  • Design-responsibility and authority-submission support

Project stages

  • Regulatory and strategy review
  • Concept performance criteria
  • Detailed design or independent review
  • Authority-submission support
  • Construction inspection and witnessing where appointed

Typical deliverables

  • Scope and responsibility matrix
  • Performance criteria and design calculations
  • System schematics and layouts
  • Cause-and-effect input
  • Equipment schedules
  • Commissioning and witness requirements

Critical interfaces

The design is controlled at the points where disciplines meet.

01

Building fire strategy

02

Means of escape and occupancy

03

Architecture and compartmentation

04

Power supplies and controls

05

Façade, shafts and discharge points

06

Authority and third-party review

Standards and review

Issue only what can be traced and checked.

Georgian Decree No. 41 and applicable authority requirements take precedence; relevant BS, BS EN and NFPA provisions are applied within the agreed project hierarchy and legal context.

Fire and life-safety advice is project-specific. Service limits, jurisdiction, building use, geometry, occupancy, fire-strategy inputs and certification responsibility must be agreed in a formal appointment. Milli MEP does not guarantee authority approval.

InputsDecisionCalculationReviewIssue

Relevant sectors

Applied where the operational brief shapes the engineering.

Appointment questions

Clarify responsibility before work starts.

Does this page provide a fire-engineering solution for my building?

No. General website information cannot establish a compliant system. The building geometry, occupancy, fire strategy, local law and defined design responsibility must be reviewed under appointment.

Can Milli MEP review a contractor’s smoke-control design?

Yes, subject to an agreed review basis, access to the governing fire strategy and calculations, and a clear statement of what the review does and does not certify.

Does design support guarantee authority approval?

No. Approval remains with the relevant authority and depends on the complete project submission, current law and matters outside Milli MEP’s control.

Project enquiry

Define the fire protection coordination appointment.

Share the project location, stage, available information, required deliverables and decision date. We will identify the correct scope and the information needed to proceed.