Statutory and authority requirements
Applicable Georgian legislation, Decree No. 41, authority conditions and location-specific statutory duties.
>
Technical governance
Milli MEP establishes the governing hierarchy, project criteria and acceptance evidence before choosing systems. Standards are interpreted within the local statutory context and the actual building risk.
MM / GOVERNANCE / 01Design hierarchy
The final hierarchy is confirmed for each appointment. A standard is not applied simply because it is familiar; it must be relevant to the jurisdiction, system, building use and stated performance objective.
Applicable Georgian legislation, Decree No. 41, authority conditions and location-specific statutory duties.
Employer’s requirements, operator standards, fire strategy, certification targets and defined project outcomes.
Recognised design, installation, testing, commissioning and building-performance guidance selected for the actual scope.
Applied where required by the project or where a superior life-safety outcome is justified and compatible with local law.
Performance assessment, calculations, options and departures documented within the design record.
Quality assurance
The review effort follows consequence. Life safety, capacity, plant selection, utility demand and irreversible spatial decisions receive explicit stage gates and acceptance evidence.
Scope, criteria, interfaces and design responsibility are confirmed.
Source, date, status and limitations of project information are recorded.
Loads, duties, assumptions and selected systems remain traceable.
Architecture, structure, fire strategy, utilities and specialist systems are reviewed.
Drawings, schedules, reports and specifications are checked and revision-managed.
Design changes are assessed for technical, spatial and commercial consequences.
Elevated review
Smoke control, stair pressurisation, firefighting systems, fire alarms and evacuation interfaces depend on the building use, geometry, occupancy, fire strategy and local law. General website material is not a project design.
A formal appointment must state the jurisdiction, design scope, reliance information, certification duty, authority interface and competent technical signatory. Authority approval is not guaranteed.
Review the fire protection coordination service boundaryVerification evidence
Project enquiry
Share the location, building use, fire-strategy status, client standards and approval route. We will identify conflicts, missing inputs and the appropriate technical basis.